The City of Shafer is in the process of preparing plans and specifications for a Street Improvements Project in your neighborhood.

Project Schedule:

Commence Construction  UPDATES:

The Crack Sealing has been rescheduled for Monday, July 2, 2018, for the City Hall and Fire Dept parking lots ONLY.

The Buffalo Ridge portion of the work has been rescheduled for a starting date of Monday, July 16, 2018.  Fahrner, the contractor doing the work, will be putting door knockers out at the homes affected by the work to advise residents.

Complete Construction- All of the street work is complete for the year, as of Sept 27, 2018
 
This 2018 Street Maintenance work is not assessable; it is a planned and budgeted maintenance.  The Bidding and Awarding contract was done at Council Meetings.

Click here for the Notice from Fahrner Asphalt, Contractor, that will be left at each affected residence in the work area.

Project Contacts:

Lucas Jones, City Engineer 612-548-3126    ljones@msa-ps.com
Fahrner Asphalt, Contractor
Jason Pearson 651-346-9026     
Dan Vogel, Mayor 651-257-6228 danv.shafermn@gmail.com
City Public Works Director 651-257-4726    publicworks@shafermn.com
 
Project Scope:

2018 Street Maintenance-starting in July
Buffalo Ridge Streets, Fire Department and City Hall Parking lots

Crack sealing will occur in July-work to start week of July 9,
Micro surfacing in August (start date to be determined).

ROUT & SEAL (Crack sealing)
Rout and seal is used on transverse (crosswise) and longitudinal cracks, involves using a
pavement saw or router to create a reservoir centered over existing cracks, then filling with a sealant.

MICRO SURFACING
Micro surfacing involves placing a slurry—which is a mixture of aggregate, asphalt emulsion, and a mineral filler such as Portland cement—into a wide crack and striking it off with a squeegee. Slurry-filling cracks is good for roadways with severe transverse cracks and/or depressed transverse cracks. A 3-foot-wide squeegee, with sideboards, is typically used to feather the material into the depressed areas.

These are the streets in Buffalo Ridge that will be in the work area:

ROADWAY TO FROM
Regal Ave 310th St 308th St
308th St Regal Ave Redwing Ave
Regal Ave 308th St 305th Ln
305th Ln Redding Ave Regal Ave
Redding Ave Reflection Ave 305th Ln
306th St Regal Ave Cul-de-Sac
306th St Regal Ave East Plat Boundary

Fahrner Asphalt is the company doing the work. They will be notifying residents in the work zone with door knockers 1-2 days in advance of the actual work. This work will affect your street for approximately 1-2 days. The street will be shut down for portions of the day while work is being done.

If you have any questions, please contact the Fahrner representative, Jason Pearson, @ 651-346-9026 or city engineer Lucas Jones, MSA Professional Services 612-548-3126.

The Fire Department and City Hall/Public Works parking lots will also be in the work zone.